research article
Predictive Schedule Optimization Framework for Aviation & Industrial Projects Using Constructability Driven Change Order Mitigation and Integrated Cost-Schedule Performance Modelling
Vol. 3 , Issue 4 (2025) · pp. 1-11
DOI: 10.64180/ijef.342501
Abstract
Complex aviation and industrial projects experience substantial schedule and cost performance challenges, with ninety-eight percent of construction projects encountering cost overruns averaging eighty percent above baseline estimates. This research presents an integrated Predictive Schedule Optimization Framework combining constructability-driven change order mitigation, earned value management, and multi-objective optimization algorithms.
Keywords:
Schedule optimization; Constructability analysis; Earned value management; Change order mitigation; Cost-schedule integration; Aviation infrastructure; Industrial projects; Predictive scheduling; multi objective optimization; Project performance modelling