“Predictive Schedule Optimization Framework for Aviation & Industrial Projects Using Constructability Driven Change Order Mitigation and Integrated Cost-Schedule Performance Modelling”. 2025. International Journal of Engineering Fields, ISSN: 3078-4425 4 (4): 1-11. https://doi.org/10.64180/.