Predictive Schedule Optimization Framework for Aviation & Industrial Projects Using Constructability Driven Change Order Mitigation and Integrated Cost-Schedule Performance Modelling. (2025). International Journal of Engineering Fields, ISSN: 3078-4425, 4(4), 1-11. https://doi.org/10.64180/