(1)
Predictive Schedule Optimization Framework for Aviation & Industrial Projects Using Constructability Driven Change Order Mitigation and Integrated Cost-Schedule Performance Modelling. IJEF 2025, 4 (4), 1-11. https://doi.org/10.64180/.