[1]
2025. Predictive Schedule Optimization Framework for Aviation & Industrial Projects Using Constructability Driven Change Order Mitigation and Integrated Cost-Schedule Performance Modelling. International Journal of Engineering Fields, ISSN: 3078-4425. 4, 4 (Nov. 2025), 1–11. DOI:https://doi.org/10.64180/.